Upphandla

Convection parts (boiler tubes) for Unit 1 in the Uppsala Waste incineration plant

Vattenfall AB Procurement Heat Sweden

No deadline

Description (in Swedish)

LTE Investment for Unit 1 in the Waste incineration Plant AFA in Uppsala, Sweden. ​ The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala. In the old waste boiler, Unit 1, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding. The steam data is 15 bar(g) and 200°C for both boiler. This procurement concerns replacement of the convection parts in the horizontal pass (three evaporator bundles and one economizer) of Unit 1, to be carried out during summer overhaul July/August 2027. As an option, the tenderer shall also include replacement of the membrane walls surrounding the horizontal passes. The Purchaser will supply detailed drawings of the existing tube bundles and the Contractor shall design, manufacture and install the new tubes with necessary adaptations to modern criteria for design, testing and inspection. Also included in the scope is a new soot cleaning system for the convection parts. The tenderer shall include removal and scrapping of the old rapping system and replacement with a more modern system. The basis for the design will be a visit to the site as well as boiler drawings.

Procedure
Förhandlat förfarande med föregående annonsering
Estimated value
25 000 000 SEK
Submission deadline
No deadline
Published
20 July 2026
Notice number
502959-2026

Similar tenders